Correction in the forecasting section

time-shift
Ferhat Mihoubi 2013-01-11 18:22:15 +01:00
parent 11e151547c
commit 4a465f2d07
1 changed files with 1 additions and 1 deletions

View File

@ -4788,7 +4788,7 @@ the restricted paths. Use @code{conditional_forecast},
@code{conditional_forecast_paths} and @code{plot_conditional_forecast} @code{conditional_forecast_paths} and @code{plot_conditional_forecast}
for that purpose. for that purpose.
If the model contains strong non-linearities, the conditional forecasts If the model contains strong non-linearities, the conditional forecasts
can be computed using an extended path method with the @code{simulation} can be computed using an extended path method with the @code{simulation_type}
option in @code{conditional_forecast} command set to @code{deterministic}. option in @code{conditional_forecast} command set to @code{deterministic}.
Because in this case deterministic simulations are carried out, Because in this case deterministic simulations are carried out,
the nature of the shocks (surprise or perfect foresight) has to be indicated the nature of the shocks (surprise or perfect foresight) has to be indicated